Close Menu
    What's Hot

    Zelestra wins 60MW in Italy FER X

    Vestas expands Polish blade factory

    Principle Power appoints new chief executive

    Facebook X (Twitter) Instagram
    Buy SmartMag Now
    • Home
    • Buy Now
    Facebook X (Twitter) Instagram
    reNEWS
    • Home
    • Features
      • Typography
      • Contact
      • View All On Demos
    • Typography
    • Buy Now
    Subscribe
    reNEWS
    Home»Offshore Wind»Europe»EnBW delivers first power at 960MW He Dreiht
    Europe

    EnBW delivers first power at 960MW He Dreiht

    Stephen DunneBy Stephen DunneNovember 26, 2025Updated:December 3, 2025No Comments2 Mins Read
    Share Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Copy Link
    Follow Us
    Google News Flipboard
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Debut Vestas 15MW turbine goes into operation at German offshore wind farm

    The first wind turbine at the EnBW’s 960MW He Dreiht offshore wind farm in the German North Sea produced its initial kilowatt-hour yesterday evening and delivered it to the grid, according to EnBW.
    The company said 27 of the site’s 64 Vestas 15MW turbines have been installed so far, with full commissioning scheduled by summer 2026.
    “The first kilowatt-hour produced by our He Dreiht offshore wind farm marks a significant milestone for EnBW,” EnBW board member for sustainable generation infrastructure Peter Heydecker said.
    He said the 960MW project is currently Germany’s largest offshore wind farm.
    Nils de Baar, president of Vestas Northern and Central Europe, said: “The 15 MW turbine is a world first in terms of technology, setting new standards in offshore wind power.”
    EnBW said a single rotation of the rotor on the 15MW unit can supply the equivalent of four households with electricity for a day.
    The developer said internal cabling was completed in August and connected to the TenneT-managed converter platform for transmission to shore.
    EnBW added that He Dreiht can generate enough electricity for around 1.1 million households and is being built without state funding about 85 kilometres northwest of Borkum and 110 kilometres west of Heligoland.
    A consortium of Allianz Capital Partners, AIP and Norges Bank Investment Management holds 49.9% of the project, with investment totalling €2.4bn.

    Follow on Google News Follow on Flipboard
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    Previous ArticleCS Wind Offshore completes CVOW transition pieces
    Next Article ESB, Orsted win 900MW Irish offshore auction
    Stephen Dunne

    Related Posts

    CIP wins permit for 480MW Morecambe

    December 1, 2025

    Ocean Winds hits €2bn BC-Wind financial close

    December 1, 2025

    OWGP awards £2.4m to UK firms

    December 1, 2025
    Add A Comment

    Comments are closed.

    Top Posts

    Subscribe to Updates

    Get the latest sports news from SportsSite about soccer, football and tennis.

    Advertisement
    Demo

    Your source for the serious news. This demo is crafted specifically to exhibit the use of the theme as a news site. Visit our main page for more demos.

    We're social. Connect with us:

    Facebook X (Twitter) Instagram Pinterest YouTube
    Top Insights
    Get Informed

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Buy Now
    © 2025 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.